FINITE STRUCTURE / OPEN CORRESPONDENCESearch the record ⌕
OverviewResearch programmesPrepared source programme
← Programme overviewStep 2 of 5 · Source & events
RSP-1 v0.1 · development — no registry entry

Run the whole candidate.

A complete prepared state now drives prospective viability, idle response, bit events and finite renewal. Compare close and hold laws on the same inputs, including the hidden changes that a net budget can miss.

02

The complete source programme

StageDeclared updateStatus
Prepared stateT, cached L, response q, active stock r, finite bank, cursor, frozen C/H branchCandidate carrier
Prospective viabilityL+=T · 1[r>0] · (1−q_old)Chosen stock/demand source
ResponseC: h+=0; H: h+=I+q_oldSource-law alternatives; neither natively selected
Feedback and consumptionr+=r−omega+; q+ and cached L+ committed togetherCandidate update
Renewal-only tickAt r=q=L=0, load the next prepared packet; advance cursor even for zero packetsFinite prepared supply
StopFull state unchanged; report exhausted/quiescent or latched/strandedModel control outcome

Integrity stays fixed in one labeled identity frame. An ordinal tick counts the programme update; it does not measure seconds. Cached prior L is not reconstructed from current stock.

03

What the finite proof gives

The integer potential V=4S+2|q|+|L_cache|+(B−k) strictly decreases on every committed tick. Both branches reach a full model fixed point.

For C, every prepared token produces one opening and one later closure; initially open responses add closures. The exact pulse duration includes zero refills and broken-seat cache cleanup. H can instead latch and strand remaining stock.

A response-null tick can still update the source cache or refill cursor. A zero net Hamming budget can still contain two opposite directed toggles. Stopping on either quantity loses those changes.

04

Keep the Hodge bridge explicit

The original latent witness uses chain amplitudes: R_e=c1,e²(c0,i²+c0,j²). RSP uses newly declared integer stocks. No carrier map identifies these objects, and a frozen integrity bit does not derive physical break/repair dynamics.

The next source programme must realize or reject this prepared carrier on an independently specified Hodge/transport source. Parallel AI construction and scope checks do not replace independent human review.

Inspect the realization gate →

New: audit the programme’s Hodge realization contract →

New: construct the finite-window joint carrier and count its resources →